Instituto Tecnológico de Canarias

Study on hydraulic calculations for the extension of the Mancomunidad del Sureste EDAM pipeline and study of alternatives in the design of the diffuser section.

Cabildo Insular de Gran Canaria

Drafting of the pilot project for the recovery and stabilization of the dune system of Maspalomas and Playa del Inglés beaches.

Confidencial

Conceptual engineering and modeling for the design of a diffuser section for a brine discharge using Venturi diffusers in Australia.

Confidencial

Diffuser section design for a brine spill in Saudi Arabia

RDMP Balikpapan JO

Design and fabrication of a submarine outfall for the discharge of a 5,000 m3/h desalination plant using venturi diffusers in Indonesia.

Confidencial

Environmental Impact Study for the installation of an offshore wind farm off the coast of Galicia

Equinor

Initial Project Document for the Fowca offshore wind farm, east of Gran Canaria